Stormwater Authority
09/05/24 Minutes
MINUTES
STORMWATER AUTHORITY | LOWER ALLEN TOWNSHIP |
REGULAR MEETING | SEPTEMBER 5, 2024 |
The following were in ATTENDANCE: | |
BOARD MEMBERS | TOWNSHIP PERSONNEL |
Timothy Johnson, Chair | Rebecca Davis, Public Works Director |
Lloyd Bucher, Vice Chair | Steven P Miner, LATSA Solicitor |
Alison J Shuler, Secretary | Barbara Arnold, Environmental Coordinator |
Robert Edwards | Commissioner Charles Brown |
Richard Schin | Renee’ Greenawalt, Recording Secretary |
Chair Johnson called the September 5, 2024, Regular Meeting of the Lower Allen Township Stormwater Authority to order at 7:55 pm. He announced the meeting had been duly advertised for publication.
APPROVAL OF MEETING MINUTES
Ms. SHULER moved to approve the minutes from the July 11, 2024, Regular Meeting. Mr. EDWARDS seconded the motion. The motion carried 5-0.
SOLICITOR’S REPORT
Solicitor’s Fee
Mr. Miner presented intent to request a modest increase to the solicitor fee for CY2025.
Borough of West Chester v. Pennsylvania State System
Mr. Miner noted some activity on the docket for the case, but that no specific details were available.
TREASURER’S REPORT
Mr. Schin reported the total cash balance, as of August 23, 2024 was $2,750,979, a decrease of $1,408,237 since the prior meeting.
Below is a summary report of Stormwater billing accounts deemed “Uncollectable” with total balances through 5/30/2024. These balances include past due principal amounts plus penalties through the last billing period (2024-Q3). Late penalties for 2024-Q3 are reflected in the figures.
Delinquent accounts
Property Owner | Accts | Balance |
Commonwealth of PA | 8 | $12,542 |
PennDOT | 4 | $1,314,173 |
PA Turnpike | 3 | $160,366 |
PA Industrial School (SCI/Prison) | 1 | $470,594 |
TOTALS | 16 | $1,957,675 |
Mr. SCHIN motioned to approve the Treasurer’s Report. Ms. SHULER seconded the motion. The motion carried 5-0.
Portnoff Update
Mrs. Arnold presented an update on collections for delinquent stormwater and refuse accounts. Since August 2023, 120 stormwater accounts were sent to Portnoff Associates for collection. She noted good progress on collections.
PUBLIC WORKS DIRECTOR REPORT:
Credit and Appeals Monthly Report
Director Davis reported there had been no credits or appeals since the prior meeting.
Payment to Kinsley Construction, LLC – Paving Infrastructure Project
Director Davis presented for consideration, payment of the LATSA portion of Estimate No. 2 to Kinsley Construction for labor for the Paving Infrastructure Project in the amount of $17,440.10. The estimate represents the work performed in the Highland Estates and Allendale neighborhoods that was inspected and approved by the Township to date for the project.
Ms. SHULER offered the motion, seconded by Mr. BUCHER. The motion passed 5-0.
Payment to Kinsley Construction, LLC – Weis/UMHC Basin Retrofit Project
Director Davis presented for consideration, Payment No. 1 in the amount of $160,920, and Payment No. 2 in the amount of $365,482.84. She noted the estimates represented the work performed, inspected and approved by the Township to date for the project.
Ms. SHULER motioned to approve Payment No. 1, seconded by Mr. BUCHER. The motion passed 5-0.
Ms. SHULER motioned to approve Payment No. 2, seconded by Mr. SCHIN. The motion passed 5-0.
Payment to Kinsley Construction, LLC – BJs Wholesale Club Basin Retrofit Project
Director Davis presented for consideration, Payment No. 1 in the amount of $22,837.50, and Payment No. 2 in the amount of $50,472.70. She noted the project was complete and that the estimates represented the work performed, inspected and approved by the Township to date for the project.
Ms. SHULER motioned to approve Payment No. 1, seconded by Mr. BUCHER. The motion passed 5-0.
Ms. SHULER motioned to approve Payment No. 2, seconded by Mr. BUCHER. The motion passed 5-0.
Payment to Kinsley Construction, LLC – Bethany Village Basin Retrofit Project
Director Davis presented for consideration, Payment No. 1 in the amount of $193,755.45, in the amount of $365,482.84. She noted the estimate represents the work performed, inspected and approved by the Township to date for the project.
Ms. SHULER motioned to approve Payment No. 2, seconded by Mr. SCHIN. The motion passed 5-0.
Director Davis presented the GIS mapping project, with a demonstration of the municipality map, showing outfall inspection points where the creeks and streams reach waters of the Commonwealth, and where they are required to inspect each of the eighty-seven points once per permit cycle. She noted that inspections are conducted more frequently. The GIS map also shows infrastructure including 617 inlets, utility holes, piping,
Basin Construction Update
Director Davis reported that the project at BJs Wholesale Club was complete, and those at Weis/UMHC and Bethany Village were partially complete. She presented photographs of each project to demonstrate existing conditions, movement of earth, engineered soils, under-drained and modified outlet structures, and hydroseeded basins. She proposed a future tour of the completed basins when they are finished.
Other Business
Director Davis reported that that budget preparations would be an item for discussion at the next meeting.
ADJOURNMENT