Sewer
Facilities Information:
- Authority sewer collection system in Lower Allen and Shiremanstown consists of over 100 miles of pipe ranging in size from 8 to 48-inches, 2,500 manholes, three metering chambers, and eight pump stations.
- Treatment plant uses a biological nutrient removal activated sludge process with chemical phosphorus removal and ultra violet disinfection to treat a design average flow of 7.5 MGD and 24 MGD peak flow. Additionally, 500 dry tons of Class A exceptional quality biosolids are produced by autothermal thermophilic aerobic digestion and recycled.
Sewer Authority Members |
|
| Term Expires | |
| Bob Edwards, Chairperson | 12/31/2027 |
| Alison Shuler, Vice Chair | 12/31/2029 |
| Lloyd Bucher, Secretary | 12/31/2028 |
| Rick Schin, Treasurer | 12/31/2030 |
| Tim Johnson, Assistant Treasurer | 12/31/2026 |

